At the October 6th School Committee Meeting, Dr. Gutekanst and Alisa Skatrud, SC Chair answered many of the frequently asked questions about the Pollard Project. To learn more, please watch the School Committee meeting, or review the presentation.

The CNS Board unanimously endorses the Pollard Project and encourages the community to vote YES on Question 10! 

Q. Why was this Pollard Project design chosen? What other options were studied?

Nine options were studied. After years of analysis, it was determined that the 2-phase, grade 6-8 project was the one that best met the educational program and community goals and was the most cost effective overall. 

The 2-phase design allows for the school to be farther from the train tracks, better storm water mitigation, and allows for a separate 6th grade center. The costs on this slide are a bit outdated. The current cost of the chosen design is $325 million (including contingencies). After $80 Million of MSBA reimbursement, the total cost to the community will be $245 million.

Q. Will the new design preserve the 6th grade center experience?

Yes! Lessons learned from High Rock will be applied to the 6th grade center at Pollard. 6th grade students will benefit from fewer transitions, more programming options, and improved special ed spaces.

Q. Would it be less expensive to just repair Pollard for 7th & 8th grade?

No. Because a new grade 6-8 building at Pollard will address infrastructure and space issues at Pollard, High Rock, and provide swing space for a future Mitchell project, it is the most economical approach long term. A base repair option was studied, but a base repair does not meet the educational plan, is not eligible for MSBA reimbursement and would not fix the underlying space issues at Pollard and High Rock. A base repair approach would also take years longer to complete and would still require Pollard to have modular classrooms that need regular replacement. 

Q. Why is the Pollard Project so expensive?

This project is for 1335 middle school students so it is a substantially larger building than the one built for Sunita Williams Elementary which has 530 students. Significant increases in construction costs nationally also contribute to the high cost of the project. The cost of the Pollard project is in line with other projects at this phase of design in MA. Schools that are opening their doors now were more affordable due to lower construction costs at the time of bidding years ago. 

Q. Why is the MSBA only partially funding the project?

Needham was given the highest rate of reimbursement possible under current MSBA policies indicating strong MSBA support of the project and Needham’s design process. The MSBA caps square foot construction costs to allow their funds to support more communities. 

Q. Can we eliminate the auditorium from the project to reduce costs?

No. Pollard currently has an auditorium that seats 450 which is in use throughout the day for educational programming. The new building will need to have an auditorium as well to continue this programming. Eliminating the auditorium would void the MSBA agreement as it is part of the educational plan. The auditorium was designed to have 750 seats to allow for a full grade to participate in an assembly (not possible in the current auditorium) and to support community needs. The larger auditorium garnered strong support at the town All-Boards summit and reducing seats would offer only minimal savings. 

Q. Why is the library smaller than MSBA size guidelines?

Needham has a very strong K-12 library program and greatly values library science in the schools. Both the High Rock & Pollard librarians were involved in the design process. The MSBA size guidelines assume that technology spaces will be included in the library, however, in Pollard’s design there are separate technology classrooms next to the library. Some other districts have turned to “distributed libraries” to decrease school size by spreading bookshelves around the school rather than having a central library. This type of design is not in line with Needham’s educational plan. 

Q. What happens if the override vote fails?

We must have a funding agreement in place by December 24th under our current agreement with the MSBA. If the override vote fails, the town has 10 days to respond to the MSBA about the reasons for a failed vote and possible remedies. If the MSBA decides to allow an extension for a revote, the vote would be on the exact same project, not a revised or smaller project. The MSBA will not allow changes to the educational plan or size of the project before a revote. The MSBA may also refuse to give the town more time and force the town to withdraw from the MSBA program which would forfeit the currently allotted $80 million dollars. We would then need to restart the MSBA process which would take 3-4 additional years, while construction costs continue to escalate. There is no guarantee that Needham would be re-accepted into the MSBA process. Surrounding communities have incurred multi-year delays in their projects after failed override votes.  However, Pollard has significant infrastructure needs that would need to be dealt with in the short term, requiring another override vote to fund repairs. 

Any alternatives would not meet the educational program, would forfeit $80 million dollars, and would still require an override vote. 

To learn more or tour Pollard, visit the School Committee Open House at Pollard on Saturday October 17 from 9-11am.